Work plan assignment overview
- Genesys Cloud CX 1 WEM Add-on II, Genesys Cloud CX 2 WEM Add-on I, Genesys Cloud CX 3 또는 Genesys Cloud EX 라이선스
- Workforce Management > Work Plan > View permissions
- Workforce Management > Business Unit > View permissions
- Workforce Management > Management Unit > View permissions
- Workforce Management > Agent > View permissions
- Groups > Work Team > View permissions
인력 관리 작업 계획 할당을 통해 관리자는 선택한 날짜 범위에 대해 에이전트에게 사전에 작업 계획을 할당할 수 있습니다. 관리자는 특정 날짜까지 기다려서 에이전트의 작업 계획을 수동으로 수정할 필요가 없습니다. 그들은 즉시 또는 나중에 적용되는 변경 사항을 만들 수 있습니다.
-
Week 1 (current week) – Late shifts
-
Week 2 (next week) – Early shifts
-
Week 3 – Early shifts
-
Week 4 – Early shifts
-
Week 5 – Early shifts
-
Week 6 return to Late shifts
The administrator creates the work plan assignments to include the change in the agent’s work plan schedule. Workforce management overrides the default work plan with the modification made in the Work Plan Assignments page. The future date changes automatically take effect on the chosen date and after the end date of the change is met, the original work plan comes back into effect.
Work plan overrides take precedence over the settings in the Work Plan Rotations and Work Plan Configurations pages, during the specified date range.
An administrator can temporarily change the work plan of an agent who is on an early shift work plan with a late shift work plan for a selected period as indicated in the following table.
An administrator can manually change the work plan or change via a work plan bid of the agent from work plan A to work plan C on week 5. This change is made in week 1 so that the future schedules generate accordingly. A work plan override bridges the time between the default work plan that is being changed and when the agent’s schedule should reflect the change.
In this instance, the agent’s default work plan is A and is working on a four-week rotation in weeks 2–5. Now the work plan is scheduled to change to work plan C for week 6. This work plan change can be manually done or changed via a work plan bid. The change is made in week 1 so that future schedules can be generated.
A work plan override bridges the time between the change in the default work plan being and the start of work plan rotation. When the work plan rotation ends at the end of week 5, the agent’s work plan automatically changes to work plan C as planned.
For more information about Work Plan Assignments, see the following articles:
Task | 설명 |
---|---|
작업 계획 할당 페이지 탐색 |
View the list of agents and details of their work plan assignments. |
업무 계획 할당 관리 | Change the existing work plan assignments, including deleting existing, assigning new work plans to the agent’s schedules. |